There are twelve steps to installing a Lock+Load retaining wall system. Read through the steps below for detailed installation instructions on each stage of the installation procedure.

# INSTALLATION STAGE
1 Excavation and Subgrade
2 Drain Placement
3 Setting Base Course
4 Setting Additional Courses
5 Compaction
6 Geo-Grid Placement
7 Placement of Specialty Pieces
8 Cutting of Panels
9 Advanced Construction Techniques
10 On Grade Construction
11 Transition from On Grade to Level
12 Installation of Sleeves